


| Parameter | Value |
|---|---|
| Value | |
| EAN | 4019169390507 |
| UPC | 662643067033 |
| ETIM | 4 |
| IDEA | 4 |
| UNSPSC | 15 |
| eClass | 6 |
| Group Code | R220 |
| Price Group | 753 |
| Metal Factor | None |
| Product Group | 9670 |
| Product class | A: Standard product which is a stock item could be returned within the returns guidelines/period. |
| Quantity Unit | 1 Piece |
| Commodity Code | 85234910 |
| Product family | STARTER commissioning tool |
| Net Weight (kg) | 0,030 Kg |
| Country of origin | Germany |
| LKZ_FDB/ CatalogID | D21MC |
| Packaging Quantity | 1 |
| Packaging Dimension | 176,00 x 250,00 x 11,00 |
| Product Description | Software on DVD: STARTER commissioning tool for SINAMICS and MICROMASTER Version V5.4 HF1 DVD for Server 2016, 2019 (64-bit) Windows 10 pro/Enterprise (64-bit) Windows 7 (64 bit) Professional, Ultimate and Enterprise (standard) German, English, Spanish French and Italian contains also the SSP for SINAMICS G120 Version V4.7 SP10 SINAMICS S120 V5.1.1, V5.2 SINAMICS MV Version V5.2 SP1 SINAMICS DCP V1.3 |
| Product Lifecycle (PLM) | PM300:Active Product |
| Export Control Regulations | AL : N / ECCN : 5D992 |
| Standard lead time ex-works | 5 Day/Days |
| Surcharge for Raw Materials | None |
| Package size unit of measure | MM |
| Product Dimensions (W x L x H) | Not available |
| Article Number (Market Facing Number) | 6SL3072-0AA00-0AG0 |
| WEEE (2012/19/EU) Take-Back Obligation | No |
| Type of accessory/spare part (EF000215) | - |
| Compliance with the substance restrictions according to RoHS directive | Given |
| REACH Art. 33 Duty to inform according to the current list of candidates | Reach InformationThere is currently no information on SVHC (Substances of Very High Concern http://echa.europa.eu/web/guest/candidate-list-table) from the supply chain and our established procedures for screening our products for Substances of Very High Concern.We compare our products regularly with the information of the upstream users with regard to the substances indicated in the candidate list in accordance with the requirements of the REACH regulation. As soon as we have new findings, our information will be updated accordingly. |
Technical specifications and performance data
Installation and operation guide